Wind tunnel testing moves AMRAAM-ER missile closer to production

New weapon will offer enhanced ground-based air defense

TUCSON, Ariz.– Raytheon Company (NYSE: RTN) successfully completed more than 1,700 rigorous wind tunnel tests on the newest, extended-range variant of the combat-proven AMRAAM® air-to-air missile. Testing is a major step in the missile’s qualification for integration with the NASAMS™ surface-based system.

The AMRAAM-ER missile is a ground-launched weapon that will intercept targets at longer distances and higher altitudes. The missile’s bigger rocket motor and smarter flight control algorithms give it a boost in range.

“During these tests, we put AMRAAM-ER through a full range of potential flight conditions to validate the missile’s future performance on the battlefield,” said Kim Ernzen, Raytheon Air Warfare Systems vice president. “Raytheon is developing this missile to enhance ground-based air defense for our customers worldwide.”

Raytheon engineers will now analyze data from the wind tunnel test runs to verify and update the AMRAAM-ER missile’s aerodynamic models to maximize its performance.

Manufactured by Raytheon and Norway’s Kongsberg Defence & Aerospace, NASAMS is the most widely used short- and medium-range air defense system in NATO. NASAMS provides a high-firepower, networked and distributed state-of-the-art air defense system that can quickly identify, engage and destroy current and evolving threat aircraft, unmanned aerial vehicles and emerging cruise missile threats.




Retail Pad at Boulevard at Surprise Pointe Trades for $2.1 Million

Cushman & Wakefield of Phoenix sells site on AMC Theater anchored center

PHOENIX, Arizona – Cushman & Wakefield sold a retail pad at Boulevard at Surprise Pointe, located at the southeast corner of Litchfield Road and Waddell Road in Surprise, Ariz. Old Republic Exchange Company of Carefree, Ariz. purchased the property from San Diego-based Surprise SE, LLC (an entity formed by CIRE Equity) for $2.1 million ($262 PSF).

Chris Hollenbeck of Cushman & Wakefield’s Phoenix office negotiated the transaction on behalf of the seller.

The 8,009-square-foot site within Boulevard at Surprise Pointe, an AMC Theater and Uptown Alley Bowling anchored center. Built in 2008, the property is 100 percent leased to Jabz Boxing, T.E.A.M. 4 Kids and Maximus Nutrition. The 3.175-acre retail center is situated across from a planned 3,000 home residential development and adjacent to ESI Venture’s 154-acre mixed-use business park.

“We are happy to sell another property for CIRE Equity. It’s been exciting to watch them stabilize Boulevard at Surprise Pointe over the years,” said Chris Hollenbeck.




Modern I-10/Ina Road interchange nearing completion in Marana

Technology just one way ADOT project is improving mobility

MARANA, Arizona – When the new interchange at Ina Road and Interstate 10 in Marana opens in the coming weeks, it will include state-of-the-art technology helping Arizona Department of Transportation engineers adjust signals to keep traffic flowing.

Work on the $128 million project, which began two years ago, includes significant improvements to the interchange and to Ina Road in a growing area northwest of Tucson. The new interchange is expected to open in early spring, while work on improvements to Ina Road and new bridges over the Santa Cruz River will continue for several months.

Traffic signals where the new I-10 ramps intersect with Ina Road will include cameras that collect data on traffic moving past. That data will help traffic engineers decide whether to alter the length of green lights to move traffic more efficiently. Marana also is adding cameras for the same purpose along Ina Road at Starcommerce Way and Camino de la Cruz.

The cameras give a 360-degree view of the intersections and replace sensors placed in cuts made in the pavement. Already is use at a number of Pima County intersections, the cameras are used only for traffic management and not for law enforcement.

The cameras are just one of the changes that will help traffic flow more smoothly through the Marana intersections.

Crews have added a lane in each direction on I-10 and on Ina Road west of the freeway. That will allow both to carry more traffic with fewer delays for drivers.

Before work began, Ina Road was at ground level and crossed railroad tracks before traveling below I-10. The new configuration includes bridges carrying Ina Road over the railroad tracks and I-10, eliminating delays when trains move through the area.

A single two-lane bridge over the Santa Cruz River has been replaced with two bridges, each carrying two lanes of traffic. The eastbound bridge opened in December 2017 and carries one lane in each direction. The westbound bridge will open this spring.

The city of Marana recently made improvements to Ina Road just east of I-10 to benefit businesses and drivers in the area.

The Ina Road improvements are just the latest in a number of interchange improvements being made along I-10 in the Tucson area Interchanges at Prince Road and Twin Peaks have been improved in recent years. A similar project at Ruthrauff Road is expected to begin by this summer.